Monthly maintenancel (250h)

Maintenance plan

250 hours

Visual inspection

  • General condition of the machine

    • Check for leaks (liquids, compressed air)

    • Check the condition of electrical, pneumatic and network connections, etc.

    • Check that all openings (doors, guards, etc.) can be properly opened and closed

    • No impact, wear or shocks on the external parts.

  • SCARA

    • General condition check, absence of marks, impacts, wear..

    • Complete cleaning

  • Storage

    • General condition check, absence of marks, impacts, wear..

    • Complete cleaning (bottom of the compartment, tray under the tools)

  • Partition

    • Check the integrity of the wipers, cleaning and lubrication

    • General condition check, absence of marks, impacts, wear.

  • Machining area

    • Check the integrity and tightness of the elastic fabric. Replace if necessary  (protective fabric or 018 276)

    • Check the connections of the probe magazine

    • Complete cleaning of the entire machining booth

  • Pneumatic and microlubrication zone  

    • Check for leaks (liquids, compressed air)

    • Check the lubricant level

    • General condition check, absence of marks, impacts, wear..

    • Complete cleaning

  • Chip recovery and lubrication area

    • Check for leaks (liquids, compressed air)

    • Check the level and condition of the lubricant

    • Check the integrity and cleanliness of the filter bag, replace if necessary.

    • General condition check, absence of marks, impacts, wear..

    • Complete cleaning

Functional test

  • Functional testing of all safety components 

    • Emergency stops (remote control and machine front)

    • Interlocking (NC door and magazine gate)

    • Partition position sensors

  • Functional tests in all operating modes and all stop modes..

    • Spindle noise, temperature and current control