Maintenance
Completed
Monthly maintenancel (250h)
Maintenance plan
250 hours
Visual inspection
General condition of the machine
Check for leaks (liquids, compressed air)
Check the condition of electrical, pneumatic and network connections, etc.
Check that all openings (doors, guards, etc.) can be properly opened and closed
No impact, wear or shocks on the external parts.
SCARA
General condition check, absence of marks, impacts, wear..
Complete cleaning
Storage
General condition check, absence of marks, impacts, wear..
Complete cleaning (bottom of the compartment, tray under the tools)
Partition
Check the integrity of the wipers, cleaning and lubrication
General condition check, absence of marks, impacts, wear.
Machining area
Check the integrity and tightness of the elastic fabric. Replace if necessary (protective fabric or 018 276)
Check the connections of the probe magazine
Complete cleaning of the entire machining booth
Pneumatic and microlubrication zone
Check for leaks (liquids, compressed air)
Check the lubricant level
General condition check, absence of marks, impacts, wear..
Complete cleaning
Chip recovery and lubrication area
Check for leaks (liquids, compressed air)
Check the level and condition of the lubricant
Check the integrity and cleanliness of the filter bag, replace if necessary.
General condition check, absence of marks, impacts, wear..
Complete cleaning
Functional test
Functional testing of all safety components
Emergency stops (remote control and machine front)
Interlocking (NC door and magazine gate)
Partition position sensors
Functional tests in all operating modes and all stop modes..
Spindle noise, temperature and current control
There are no comments for now.